Skip to content
An official website of the Velocity Interoperability Network

Statistics

The Heritage Office of the Velocity Interoperability Network publishes statistics on the Register of Protected Sites, on the sites it records as at risk, and on its own activity: proposals received and decided, applications for consent received and decided, and inspections carried out. This first release records the position at establishment on 6 September 2026 and the activity of the transition period from 10 August to 5 September 2026, during which member organisations transferred their lists and interim arrangements to the Office.

The figures are drawn from the lists supplied by member organisations, from the Office's inspection records and from the register of proposals and applications kept under the interim arrangements. Figures for the transition period are provisional and will be revised in later releases where late returns are received.

The position at establishment. The figures below record the Office at the point of establishment.

18
Entries on the Register of Protected Sites at establishment
9
Entries held for further assessment, with decisions expected by December 2026
5
Protected sites recorded on the Heritage at Risk Register
7
Proposals for designation received under the interim arrangements

The Register by site. Every principal site of the Network has at least one protected site. Central Exchange and Southbank Terminal, the two oldest settled sites, have four entries each and between them account for both Grade I listed buildings and two of the three conservation areas.

Register of Protected Sites by site and designation, as at 6 September 2026
SiteScheduled monumentsListed buildingsConservation areasRegistered landscapesTotal
Central Exchange03104
Northgate Relay21003
Southbank Terminal12104
Eastfield Campus11002
Westbrook Distribution Site11103
Meridian Court10012
Total683118

The Register by designation. The table below sets each designation against the number of its entries recorded as at risk and the number of entries held for assessment that, if confirmed, would be added to it. Scheduled monuments are the designation most at risk: half of the six are on the Heritage at Risk Register. The seven held listed buildings are counted at Grade II, the grade at which an entry is normally first considered; the grade is settled on assessment.

Entries, sites at risk and held entries by designation
DesignationEntriesOf which at riskHeld for assessment
Scheduled monuments632
Listed buildings, Grade I200
Listed buildings, Grade II627
Conservation areas300
Registered landscapes100
Total1859

Activity during the transition. Before the Office's procedures came into force, proposals and requests for consent were dealt with under interim arrangements at the principal sites. The activity recorded under those arrangements is shown below.

Recorded activity, 10 August to 5 September 2026
Activity10 to 23 August24 August to 5 SeptemberTotal
Entries reviewed from the lists of member organisations141731
Entries confirmed to the Register61218
Proposals for designation received347
Requests for consent for works received5712
Requests for consent for works determined369
Site inspections carried out111526

The rise in every series between the two halves of the period reflects the completion of the transfer of lists from member organisations and the publication of the interim arrangements. Of the twelve requests for consent received, nine were determined: seven granted, two of them subject to conditions, and two refused. The three outstanding, together with the seven proposals, have been carried into the Office's procedures with their original dates of receipt.

Capacity from September 2026. The figures below record the capacity the Office has established for its first months of operation.

6
Inspectors, one assigned to each principal site of the Network
460
Buildings and monuments expected to be recorded by the survey by December 2026
60
Working days allowed for the assessment and consultation of a proposal
8–13
Weeks allowed for a decision on an application for consent, by designation

The Office will publish statistics quarterly. The next release, covering the quarter ending 30 September 2026, will be published in October 2026 and announced in the Newsroom. It will report for the first time on proposals and applications received under the Office's own procedures and on the progress of the survey. For the procedures these figures report on, see Proposing a Designation and Consent for Works; for the sites at risk, see Heritage at Risk. Questions about these figures may be sent to contact@heritage.gov.vin.